Straubing, Deutschland
XL4 2700 x 2350 mm
For the construction of the Danube expansion in the Straubingen region, we installed our products for flood protection on many sections of the river.
Important facts:
+ XL4 penstock 1800 × 1800 mm, 2700 × 2350 mm, 4000 × 1850 mm
+ XL3 channel penstock 3000 × 2200 mm
+ XM4 penstock 1000 × 1000 mm, 800 × 800 mm
+ Flap coverDN 1000, DN 800
+ BÜSCH actuator package for the penstocks
+ Bevel gearbox
Straubing, Deutschland
Rückstauklappe
For the construction of the Danube expansion in the Straubingen region, we installed our products for flood protection on many sections of the river.
Important facts:
+ XL4 penstock 1800 × 1800 mm, 2700 × 2350 mm, 4000 × 1850 mm
+ XL3 channel penstock 3000 × 2200 mm
+ XM4 penstock 1000 × 1000 mm, 800 × 800 mm
+ Flap coverDN 1000, DN 800
+ BÜSCH actuator package for the penstocks
+ Bevel gearbox
Jaruge, Croatia
XL4 penstock with 13 mWs
One of the largest and most important pilot projects in Croatia in 2017, with the task of combining agricultural irrigation with flood protection, was recently completed. The project, which is 80% financed by the EU, serves on the one hand for irrigation and thus for soil improvement of the so-called BIDJ-BOSUT field with the help of a 14.5-kilometer-long canal and, on the other hand, protection against flooding in the event of high water from the adjacent Sava River.
Important facts:
+ 3x XL4 penstock 3000 × 4500 mm with 13mWs
+ 10x 15 m high stop logs-frames and 4x stop logs sets 3000 × 9000 mm
Jaruge, Croatia
XL4 penstock 3000 × 4500 mm
One of the largest and most important pilot projects in Croatia in 2017, with the task of combining agricultural irrigation with flood protection, was recently completed. The project, which is 80% financed by the EU, serves on the one hand for irrigation and thus for soil improvement of the so-called BIDJ-BOSUT field with the help of a 14.5-kilometer-long canal and, on the other hand, protection against flooding in the event of high water from the adjacent Sava River.
Important facts:
+ 3x XL4 penstock 3000 × 4500 mm with 13mWs
+ 10x 15 m high stop logs-frames and 4x stop logs sets 3000 × 9000 mm
Oberndorf, Austria
XL4 semicircular penstock
The municipality of Oberndorf in Salzburger Land has revised its flood protection concept due to the extreme flooding in June 2013. The location was a particular challenge: three streams flow directly into the Salzach in the local area. A flood overflow tower and a pumping station with screw conveyors form the center of the protection system.
Important facts:
+XL3 weir type channel penstock 3760 × 2450 mm
+XL4 semicircular penstock
+ BEA©Servo electric actuators
Oberndorf, Austria
BEA©Servo electric actuator
The municipality of Oberndorf in Salzburger Land has revised its flood protection concept due to the extreme flooding in June 2013. The location was a particular challenge: three streams flow directly into the Salzach in the local area. A flood overflow tower and a pumping station with screw conveyors form the center of the protection system.
Important facts:
+XL3 weir type channel penstock 3760 × 2450 mm
+XL4 semicircular penstock
+ BEA©Servo electric actuators
Oberndorf, Austria
XL3 weir type channel penstock
The municipality of Oberndorf in Salzburger Land has revised its flood protection concept due to the extreme flooding in June 2013. The location was a particular challenge: three streams flow directly into the Salzach in the local area. A flood overflow tower and a pumping station with screw conveyors form the center of the protection system.
Important facts:
+XL3 weir type channel penstock 3760 × 2450 mm
+XL4 semicircular penstock
+ BEA©Servo electric actuators
Brčko, Bosnia and Herzegovina
XL4 penstock 1400 x 2250 mm
After the extreme floods in May 2014, which caused dozens of deaths and great financial damage in the region, the project of the flood protection structure was pushed ahead by the state with high priority. On January 14th, 2015, the four XL4 penstocks could be installed in a flood protection structure in be installed on site near Brčko by our assembly team.
Important facts:
+ 4x XL4 penstock 1400 × 2250 mm
Sösetalsperre, Germany
Stop gates 1000 x 1000 mm
Important facts:
+ SAFOX© DN 1000, DN 600 with spindle extension
+ Stop logs 1000 × 1000 mm & 1000 × 1150 mm with an installation depth of 8500 mm
+ Bar screen