Reference projects
Feel free to contact us for more information or to work together on your next successful project - by email or phone call.
Feel free to contact us for more information or to work together on your next successful project - by email or phone call.

Gaildorf, Germany
XL4 double-plate penstock

The Gaildorf 2018 natural power storage pilot project is breaking new ground, which requires individualized products - BÜSCH accompanies you from planning and design to production and assembly.
The first BÜSCH delivery could be inspected at the end of 2018 in the already installed condition. A custom-made double-plate penstock (2000 × 5000 mm) with independently moving plates. This is located in an inlet and outlet structure that regulates the water balance of the power plant - once between the lower reservoir and the adjacent river Kocher and also between the lower reservoir and the pump turbines.
Scope of delivery:
+ XL4 double-plate penstock 2000 × 5000 mm

Prague, Czech Republic
Penstocks

The new wastewater treatment plant is designed for 1.2 million inhabitants and allows the city to comply with EU guidelines.
Scope of delivery:
+ 137 penstocks of different series (CP4, XL4, XL3) & size
+ Rotary weir 3000 × 810 mm
+ 58x Stop logs
+ Dismantling joints made of stainless steel up to a size of DN 1400, PN 10

Prague, Czech Republic
Dismantling joints

The new wastewater treatment plant is designed for 1.2 million inhabitants and allows the city to comply with EU guidelines.
Scope of delivery:
+ 137 penstocks of different series (CP4, XL4, XL3) & size
+ Rotary weir 3000 × 810 mm
+ 58x Stop logs
+ Dismantling joints made of stainless steel up to a size of DN 1400, PN 10

Berlin, Germany
2x 2000 x 3000 mm XL4 penstock

"Berliner Wasserbetriebe" has been expanding its wastewater treatment plant in Waßmannsdorf since 2017. This extensive project had high requirements and specifications with a tight schedule.
Scope of project:
+ 71 Penstock with stem pipe (XL3, XL4, SAFOX)
+ wide: 250 × 250 - 2x 2000 × 3000 mm
+ with SENTINEL position indicators & automatic spindle lubrication
+ 20 Rotary weir
+ 30 Dam systems, consisting of 357 single stop logs
+ wide: 1100 - 3100 mm with a damming height of 1571 - 4575 mm

Berlin, Germany
Channel penstockswith actuators

"Berliner Wasserbetriebe" has been expanding its wastewater treatment plant in Waßmannsdorf since 2017. This extensive project had high requirements and specifications with a tight schedule.
Scope of project:
+ 71 Penstock with stem pipe (XL3, XL4, SAFOX)
+ wide: 250 × 250 - 2x 2000 × 3000 mm
+ with SENTINEL position indicators & automatic spindle lubrication
+ 20 Rotary weir
+ 30 Dam systems, consisting of 357 single stop logs
+ wide: 1100 - 3100 mm with a damming height of 1571 - 4575 mm

Berlin, Germany
Penstock with push-pull rod

"Berliner Wasserbetriebe" has been expanding its wastewater treatment plant in Waßmannsdorf since 2017. This extensive project had high requirements and specifications with a tight schedule.
Scope of project:
+ 71 Penstock with stem pipe (XL3, XL4, SAFOX)
+ wide: 250 × 250 - 2x 2000 × 3000 mm
+ with SENTINEL position indicators & automatic spindle lubrication
+ 20 Rotary weir
+ 30 Dam systems, consisting of 357 single stop logs
+ wide: 1100 - 3100 mm with a damming height of 1571 - 4575 mm

Berlin, Deutschland
Penstock with hand wheel

"Berliner Wasserbetriebe" has been expanding its wastewater treatment plant in Waßmannsdorf since 2017. This extensive project had high requirements and specifications with a tight schedule.
Scope of project:
+ 71 Penstock with stem pipe (XL3, XL4, SAFOX)
+ wide: 250 × 250 - 2x 2000 × 3000 mm
+ with SENTINEL position indicators & automatic spindle lubrication
+ 20 Rotary weir
+ 30 Dam systems, consisting of 357 single stop logs
+ wide: 1100 - 3100 mm with a damming height of 1571 - 4575 mm

Berlin, Deutschland
Rotary weir

"Berliner Wasserbetriebe" has been expanding its wastewater treatment plant in Waßmannsdorf since 2017. This extensive project had high requirements and specifications with a tight schedule.
Scope of project:
+ 71 Penstock with stem pipe (XL3, XL4, SAFOX)
+ wide: 250 × 250 - 2x 2000 × 3000 mm
+ with SENTINEL position indicators & automatic spindle lubrication
+ 20 Rotary weir
+ 30 Dam systems, consisting of 357 single stop logs
+ wide: 1100 - 3100 mm with a damming height of 1571 - 4575 mm

Werda, Germany
Stop logs with SAFOX

Scope of delivery:
+ SAFOX DN 300, DN 500 and DN 1200
+ Bar screen
+ Stop logs

Werda, Germany
SAFOX F DN 300

Scope of delivery:
+ SAFOX DN 300, DN 500 and DN 1200
+ Bar screen
+ Stop logs

Werda, Germany
SAFOX

Scope of delivery:
+ SAFOX DN 300, DN 500 and DN 1200
+ Bar screen
+ Stop logs

Werda, Germany
Bar screen with SAFOX

Scope of delivery:
+ SAFOX DN 300, DN 500 and DN 1200
+ Bar screen
+ Stop logs

London, England
Penstocks & channel penstocks

The £635 million Lee Tunnel project in London includes the construction of a nearly seven kilometer long and seven meter wide tunnel, the Lee Tunnel.
Scope of delivery:
+ 149 Penstocks and weir type channel penstocks from 2500 × 3000 mm up to 4150 × 5300 mm and up to 9 mwc
+ 12x Flap cover to 3000 × 3000 mm
+ 25x Overfall weir to 3000 × 305 mm

London, England
Penstocks & channel penstocks

The £635 million Lee Tunnel project in London includes the construction of a nearly seven kilometer long and seven meter wide tunnel, the Lee Tunnel.
Scope of delivery:
+ 149 Penstocks and weir type channel penstocks from 2500 × 3000 mm up to 4150 × 5300 mm and up to 9 mwc
+ 12x Flap cover to 3000 × 3000 mm
+ 25x Overfall weir to 3000 × 305 mm